52.248-2.dita

Files changed (1) hide show
  1. dita/52.248-2.dita +6 -6
dita/52.248-2.dita CHANGED
@@ -21,7 +21,7 @@
21
21
  <li class="- topic/li ">
22
22
  <p class="- topic/p " id="d3749e21">
23
23
  <ph props="autonumber" class="- topic/ph ">(a)</ph>
24
- <i class="+ topic/ph hi-d/i ">General</i>. The Contractor shall (1) perform value engineering (VE) services and submit progress reports as specified in the Schedule; and (2) submit to the Contracting Officer any resulting value engineering proposals (VEPs). Value engineering activities shall be performed concurrently with, and without delay to, the schedule set forth in the contract. The services shall include VE evaluation and review and study of design documents immediately following completion of the 35 percent design state or at such stages as the Contracting Officer may direct. Each separately priced line item for VE services shall define specifically the scope of work to be accomplished and may include VE studies of items other than design documents. The Contractor shall be paid as the contract specifies for this effort, but shall not share in savings which may result from acceptance and use of VEPs by the Government.</p>
24
+ <i class="+ topic/ph hi-d/i ">General</i>. The Contractor shall (1) perform value engineering (VE) services and submit progress reports as specified in the Schedule; and (2) submit to the Contracting Officer any resulting value engineering proposals (VEP's). Value engineering activities shall be performed concurrently with, and without delay to, the schedule set forth in the contract. The services shall include VE evaluation and review and study of design documents immediately following completion of the 35 percent design state or at such stages as the Contracting Officer may direct. Each separately priced line item for VE services shall define specifically the scope of work to be accomplished and may include VE studies of items other than design documents. The Contractor shall be paid as the contract specifies for this effort, but shall not share in savings which may result from acceptance and use of VEP's by the Government.</p>
25
25
  </li>
26
26
  <li class="- topic/li ">
27
27
  <p class="- topic/p " id="d3749e28">
@@ -41,7 +41,7 @@
41
41
  <li class="- topic/li ">
42
42
  <p class="- topic/p " id="d3749e43">
43
43
  <ph props="autonumber" class="- topic/ph ">(c)</ph>
44
- <i class="+ topic/ph hi-d/i ">Submissions</i>. After award of an architect-engineering contract the contractor shall-</p>
44
+ <i class="+ topic/ph hi-d/i ">Submissions</i>. After award of an architect-engineering contract the contractor shall&#8212;</p>
45
45
  <ol id="d3705e71" class="- topic/ol ">
46
46
  <li class="- topic/li ">
47
47
  <p class="- topic/p " id="d3749e51">
@@ -51,12 +51,12 @@
51
51
  <li class="- topic/li ">
52
52
  <p class="- topic/p " id="d3749e56">
53
53
  <ph props="autonumber" class="- topic/ph ">(2)</ph>
54
- Submit, for approval by the Contracting Officer, a list of team members and their respective resumes representing the engineering disciplines required to complete the study effort, and evidence of the team leaders qualifications and engineering discipline. Subsequent changes or substitutions to the approved VE team shall be submitted in writing to the Contracting Officer for approval; and</p>
54
+ Submit, for approval by the Contracting Officer, a list of team members and their respective resumes representing the engineering disciplines required to complete the study effort, and evidence of the team leader's qualifications and engineering discipline. Subsequent changes or substitutions to the approved VE team shall be submitted in writing to the Contracting Officer for approval; and</p>
55
55
  </li>
56
56
  <li class="- topic/li ">
57
57
  <p class="- topic/p " id="d3749e61">
58
58
  <ph props="autonumber" class="- topic/ph ">(3)</ph>
59
- The team leader shall be responsible for pre-study work assembly and shall edit, reproduce, and sign the final report and each VEP. All VEPs, even if submitted earlier as an individual submission, shall be contained in the final report.</p>
59
+ The team leader shall be responsible for pre-study work assembly and shall edit, reproduce, and sign the final report and each VEP. All VEP's, even if submitted earlier as an individual submission, shall be contained in the final report.</p>
60
60
  </li>
61
61
  </ol>
62
62
  </li>
@@ -68,7 +68,7 @@
68
68
  <li class="- topic/li ">
69
69
  <p class="- topic/p " id="d3749e74">
70
70
  <ph props="autonumber" class="- topic/ph ">(1)</ph>
71
- A description of the difference between the existing and proposed design, the comparative advantages and disadvantages of each, a justification when an items function is being altered, the effect of the change on system or facility performance, and any pertinent objective test data.</p>
71
+ A description of the difference between the existing and proposed design, the comparative advantages and disadvantages of each, a justification when an item's function is being altered, the effect of the change on system or facility performance, and any pertinent objective test data.</p>
72
72
  </li>
73
73
  <li class="- topic/li ">
74
74
  <p class="- topic/p " id="d3749e79">
@@ -100,7 +100,7 @@
100
100
  <li class="- topic/li ">
101
101
  <p class="- topic/p " id="d3749e104">
102
102
  <ph props="autonumber" class="- topic/ph ">(e)</ph>
103
- <i class="+ topic/ph hi-d/i ">VEP acceptance</i>. Approved VEPs shall be implemented by bilateral modification to this contract.</p>
103
+ <i class="+ topic/ph hi-d/i ">VEP acceptance</i>. Approved VEP's shall be implemented by bilateral modification to this contract.</p>
104
104
  </li>
105
105
  </ol>
106
106
  <p class="- topic/p " outputclass="Endofclause">(End of clause)</p>