- If the failure to perform is caused by the failure of a subcontractor at any tier to perform or make progress, and if the cause of the failure was beyond the control of both the Contractor and subcontractor, and without the fault or negligence of either, the Contractor shall not be deemed to be in default,- unless-</p>
29
+ If the failure to perform is caused by the failure of a subcontractor at any tier to perform or make progress, and if the cause of the failure was beyond the control of both the Contractor and subcontractor, and without the fault or negligence of either, the Contractor shall not be deemed to be in default,- unless&#8212;</p>
30
30
  <ol id="d3721e44" class="- topic/ol ">
31
31
  <li class="- topic/li ">
32
32
  <p class="- topic/p " id="d3765e32">